  "as_of": "2026-06-22",
  "cited_gin": "GI-SISS-2026-04",
  "hash_verified": true,
  "raw_file_sha256": "b7ee16555e89c6eee5ce7393e3129c74e5148ca72d0f85366ee80b53aed123f7",
  "row_values": {
    "capacity_mw": "150",
    "cause_of_delay": null,
    "cessation_date": null,
    "cluster_group": null,
    "commercial_operation_date": "6/1/2028",
    "current_cluster": "RTOE Transitional Cluster",
    "date_withdrawn": null,
    "fuel_type": null,
    "generation_interconnection_number": "GI-SISS-2026-04",
    "generation_type": "Battery/Storage",
    "ifs_queue_number": null,
    "in_service_date": "1/3/2028",
    "jtiq_commitment": null,
    "jtiq_participant": null,
    "max_summer_mw": "150",
    "max_winter_mw": "150",
    "nameplate_capacity_mw": "0",
    "native_status": "DISIS STAGE",
    "nearest_town_or_county": "Kit Carson County,",
    "original_generator_commercial_op_date": null,
    "request_received": "2/9/2026",
    "requested_max_injection_mw": "0",
    "requested_nrd_mw": "0",
    "service_type": "ER",
    "state_raw": "CO",
    "substation_or_line": "Looff 230 Substation (Burlington\nExpansion)",
    "to_at_poi": "TSGT"
  },
  "sheet": "GI_Summary",
  "source_file": "spp-gi_2026-06-22_sample.csv",
  "source_id": "energy.spp.queue",
  "source_row": 37,
  "source_url": "https://opsportal.spp.org/Studies/GISummary"
}