  "as_of": "2026-06-22",
  "citations": {
    "c1": {
      "source_rows_count": 157,
      "verify": {
        "as_of": "2026-06-22",
        "raw_file_sha256": "b7ee16555e89c6eee5ce7393e3129c74e5148ca72d0f85366ee80b53aed123f7",
        "sheet": "GI_Summary",
        "source_file": "spp-gi_2026-06-22_sample.csv",
        "source_id": "energy.spp.queue",
        "source_row": 37,
        "source_url": "https://opsportal.spp.org/Studies/GISummary"
      }
    }
  },
  "primitive": "query_power_interconnection_queue_spp_v1",
  "query": {
    "as_of": "2026-06-22",
    "group_by": [],
    "include_records": true,
    "limit": 1,
    "native_status": [
      "DISIS STAGE"
    ]
  },
  "records": [
    {
      "as_of": "2026-06-22",
      "capacity_mw": 150.0,
      "cause_of_delay": null,
      "cessation_date": null,
      "citation": {
        "as_of": "2026-06-22",
        "raw_file_sha256": "b7ee16555e89c6eee5ce7393e3129c74e5148ca72d0f85366ee80b53aed123f7",
        "sheet": "GI_Summary",
        "source_file": "spp-gi_2026-06-22_sample.csv",
        "source_id": "energy.spp.queue",
        "source_row": 37,
        "source_url": "https://opsportal.spp.org/Studies/GISummary"
      },
      "cluster_group": null,
      "commercial_operation_date": "2028-06-01",
      "county_fips": null,
      "county_fips_source": null,
      "county_fips_unresolved": false,
      "current_cluster": "RTOE Transitional Cluster",
      "date_withdrawn": null,
      "fuel_type": null,
      "generation_interconnection_number": "GI-SISS-2026-04",
      "generation_type": "Battery/Storage",
      "ifs_queue_number": null,
      "in_service_date": "2028-01-03",
      "iso": "SPP",
      "jtiq_commitment": null,
      "jtiq_participant": null,
      "max_summer_mw": 150.0,
      "max_winter_mw": 150.0,
      "nameplate_capacity_mw": 0.0,
      "native_status": "DISIS STAGE",
      "nearest_town_or_county": "Kit Carson County,",
      "original_generator_commercial_op_date": null,
      "raw_file_sha256": "b7ee16555e89c6eee5ce7393e3129c74e5148ca72d0f85366ee80b53aed123f7",
      "report_period": "2026-06-22",
      "request_received": "2026-02-09",
      "requested_max_injection_mw": 0.0,
      "requested_nrd_mw": 0.0,
      "service_type": "ER",
      "source_id": "energy.spp.queue",
      "source_record_key": "GI-SISS-2026-04",
      "source_row_number": 37,
      "state": "CO",
      "state_raw": "CO",
      "substation_or_line": "Looff 230 Substation (Burlington\nExpansion)",
      "to_at_poi": "TSGT"
    }
  ],
  "rows": [
    {
      "group": {},
      "lineage": {
        "citation_ref": "c1"
      },
      "metrics": {
        "capacity_mw": 43685.883,
        "source_record_count": 157
      }
    }
  ],
  "source_id": "energy.spp.queue",
  "summary": {
    "group_count": 1,
    "totals": {
      "capacity_mw": 43685.883,
      "source_record_count": 157
    }
  }
}