  "as_of": "2026-06-22",
  "citations": {
    "c1": {
      "source_rows_count": 2,
      "verify": {
        "as_of": "2026-06-22",
        "raw_file_sha256": "941c85f6edf77026e68e9845fd119fdd5027de8e7ed5c942c65888d0b4cee8a1",
        "sheet": "Data",
        "source_file": "pjm-cycle_2026-06-22_sample.xlsx",
        "source_id": "energy.pjm.cycle",
        "source_row": 1,
        "source_url": "https://www.pjm.com/planning/m/cycle-service-request-status"
      }
    }
  },
  "notes": [
    {
      "code": "requested_not_built",
      "field": "requested_max_output_mw",
      "message": "The requested_* megawatts are REQUESTED interconnection capacity in PJM's cluster/cycle process (a waiting line), NOT built/installed/operating capacity \u2014 most queued capacity withdraws before it is built. Filter `cycle` (TC1 / TC2 transition cycles, C01+ the reopened steady-state cycles) and `status` (Active / Withdrawn / In Service) to scope. PJM also reports `in_service_mw`, the realized BUILT MW (a separate figure). For operating capacity use query_power_capacity_v1. This is PJM's cluster/cycle grid \u2014 a DIFFERENT publication from PJM's full New Services queue (query_power_interconnection_queue_pjm_v1); never sum or compare across the two, or across ISOs (the MISO queue is query_power_interconnection_queue_v1)."
    },
    {
      "code": "no_status_filter",
      "field": "status",
      "message": "No status filter was applied, so this total spans ALL statuses \u2014 the cycle grid is dominated by Withdrawn requests. Pass filters INSIDE a `params` object, e.g. {\"params\": {\"status\": \"Active\"}}."
    }
  ],
  "primitive": "query_power_interconnection_queue_pjm_cycle_v1",
  "query": {
    "as_of": "2026-06-22",
    "cycle": [
      "C01"
    ],
    "group_by": [],
    "include_records": true,
    "limit": 1
  },
  "records": [
    {
      "actual_in_service_date": null,
      "as_of": "2026-06-22",
      "backfeed_date": null,
      "capacity_or_energy": "CAPACITY_RESOURCE",
      "citation": {
        "as_of": "2026-06-22",
        "raw_file_sha256": "941c85f6edf77026e68e9845fd119fdd5027de8e7ed5c942c65888d0b4cee8a1",
        "sheet": "Data",
        "source_file": "pjm-cycle_2026-06-22_sample.xlsx",
        "source_id": "energy.pjm.cycle",
        "source_row": 2,
        "source_url": "https://www.pjm.com/planning/m/cycle-service-request-status"
      },
      "commercial_name": null,
      "commercial_operation_milestone": null,
      "county": "Middlesex",
      "county_fips": "34023",
      "county_fips_source": "name",
      "county_fips_unresolved": false,
      "csa_usca_report": null,
      "csa_usca_report_status": "Not Started",
      "cycle": "C01",
      "developer": "Heritage Power Marketing, LLC",
      "epa_gia_wmpa_report": null,
      "epa_gia_wmpa_report_status": "Not Started",
      "final_sis_report": null,
      "final_sis_report_status": "Not Required",
      "fuel": "Storage",
      "in_service_mw": 0.0,
      "is_hybrid": false,
      "iso": "PJM",
      "last_updated": "2025-05-30",
      "ltf_mw": null,
      "name": null,
      "phase1_sis_report": null,
      "phase1_sis_report_status": "Not Required",
      "phase2_sis_report": null,
      "phase2_sis_report_status": "Not Required",
      "phase3_sis_report": null,
      "phase3_sis_report_status": "Not Required",
      "project_id": "C01-1012",
      "project_id_raw": "C01-1012",
      "project_type": "Generation Interconnection",
      "raw_file_sha256": "941c85f6edf77026e68e9845fd119fdd5027de8e7ed5c942c65888d0b4cee8a1",
      "report_period": "2026-06-22",
      "requested_in_service_date": "2028-11-24",
      "requested_max_output_mw": 211.3,
      "requested_summer_mw": 0.0,
      "requested_winter_mw": 0.0,
      "rights_mw": null,
      "sheet_name": "Data",
      "source_id": "energy.pjm.cycle",
      "source_record_key": "C01-1012",
      "source_row_number": 2,
      "stage": "Application Submission",
      "state": "NJ",
      "state_raw": "NJ",
      "status": "Withdrawn",
      "submitted_date": "2025-05-30",
      "test_energy_date": null,
      "transmission_owner": "JCPL",
      "transmission_type": null,
      "tsr_end_date": null,
      "tsr_id": null,
      "tsr_start_date": null,
      "withdrawn_date": "2025-07-10",
      "withdrawn_remarks": "CIW"
    }
  ],
  "rows": [
    {
      "group": {},
      "lineage": {
        "citation_ref": "c1"
      },
      "metrics": {
        "in_service_mw": 0.0,
        "ltf_mw": null,
        "requested_max_output_mw": 461.3,
        "requested_summer_mw": 250.0,
        "requested_winter_mw": 250.0,
        "source_record_count": 2
      }
    }
  ],
  "source_id": "energy.pjm.cycle",
  "summary": {
    "group_count": 1,
    "totals": {
      "in_service_mw": 0.0,
      "ltf_mw": null,
      "requested_max_output_mw": 461.3,
      "requested_summer_mw": 250.0,
      "requested_winter_mw": 250.0,
      "source_record_count": 2
    }
  }
}