  "as_of": "2026-06-20",
  "citations": {
    "c1": {
      "source_rows_count": 1,
      "verify": {
        "as_of": "2026-06-20",
        "raw_file_sha256": "532f93c072af76c3df17cbc682b9b0c6e431f0b67be0c68f12ba43735fecc0d5",
        "sheet": "Data",
        "source_file": "pjm-queue_2026-06-20_sample.xlsx",
        "source_id": "energy.pjm.queue",
        "source_row": 1,
        "source_url": "https://www.pjm.com/planning/services-requests/interconnection-queues.aspx"
      }
    }
  },
  "notes": [
    {
      "code": "requested_not_built",
      "field": "requested_max_output_mw",
      "message": "The requested_* megawatts (requested_max_output_mw / requested_summer_mw / requested_winter_mw) are REQUESTED interconnection capacity (the PJM New Services queue / waiting line), NOT built, installed, or operating capacity. Historically most queued capacity withdraws before it is built, so a requested-MW total is not a measure of capacity that exists or will exist. Filter `status` (e.g. Active / Withdrawn / In Service) to scope the queue. PJM also reports `in_service_mw` \u2014 the realized BUILT MW for in-service projects (a separate, built figure, not a request). For operating capacity use query_power_capacity_v1. PJM only \u2014 never summed or compared across ISOs; for the MISO queue use query_power_interconnection_queue_v1."
    },
    {
      "code": "no_status_filter",
      "field": "status",
      "message": "No status filter was applied, so this total spans ALL statuses \u2014 the PJM queue is dominated by Withdrawn requests; the live pipeline is status=Active (plus Under Construction / In Service for built projects). Pass filters INSIDE a `params` object, e.g. {\"params\": {\"status\": \"Active\"}} \u2014 a filter at the top level is ignored by the MCP transport and returns the full, unscoped queue."
    }
  ],
  "primitive": "query_power_interconnection_queue_pjm_v1",
  "query": {
    "as_of": "2026-06-20",
    "group_by": [],
    "include_records": true,
    "limit": 1,
    "state": [
      "PA"
    ]
  },
  "records": [
    {
      "actual_in_service_date": "2002-04-01",
      "alternate_project": "No",
      "as_of": "2026-06-20",
      "attachment_type": "N",
      "backfeed_date": null,
      "capacity_or_energy": "Capacity",
      "citation": {
        "as_of": "2026-06-20",
        "raw_file_sha256": "532f93c072af76c3df17cbc682b9b0c6e431f0b67be0c68f12ba43735fecc0d5",
        "sheet": "Data",
        "source_file": "pjm-queue_2026-06-20_sample.xlsx",
        "source_id": "energy.pjm.queue",
        "source_row": 1,
        "source_url": "https://www.pjm.com/planning/services-requests/interconnection-queues.aspx"
      },
      "commercial_name": "Ironwood",
      "commercial_operation_milestone": "2002-04-01",
      "construction_service_agreement": null,
      "construction_service_agreement_status": "Not Required",
      "county": "Lebanon",
      "county_fips": "42075",
      "county_fips_source": "name",
      "county_fips_unresolved": false,
      "facilities_study": "https://www.pjm.com/pjmfiles/pub/planning/project-queues/facilities/a01_fac.pdf",
      "facilities_study_status": "Document Posted",
      "feasibility_study": "https://www.pjm.com/pjmfiles/pub/planning/project-queues/feas_docs/a01_fea.pdf",
      "feasibility_study_status": "Document Posted",
      "fuel": "Natural Gas",
      "in_service_mw": 673.0,
      "initial_study": "N/A",
      "interconnection_agreement": "https://www.pjm.com/pjmfiles/pub/planning/project-queues/isa/a01_isa.pdf",
      "interconnection_agreement_status": "Document Posted",
      "is_hybrid": false,
      "iso": "PJM",
      "ltf_service_end_date": null,
      "ltf_service_start_date": null,
      "name": "South Lebanon 230 KV",
      "project_ac_dc": null,
      "project_id": "A01",
      "project_id_raw": "A01",
      "project_type": "Generation Interconnection",
      "projected_in_service_date": "2002-04-01",
      "raw_file_sha256": "532f93c072af76c3df17cbc682b9b0c6e431f0b67be0c68f12ba43735fecc0d5",
      "report_period": "2026-06-20",
      "requested_max_output_mw": 720.0,
      "requested_summer_mw": 673.0,
      "requested_winter_mw": 720.0,
      "rights_mw": null,
      "sheet_name": "Data",
      "sliding_project": null,
      "source_id": "energy.pjm.queue",
      "source_record_key": "A01",
      "source_row_number": 1,
      "state": "PA",
      "state_raw": "PA",
      "status": "In Service",
      "submitted_date": "1997-04-01",
      "system_impact_study": "https://www.pjm.com/pjmfiles/pub/planning/project-queues/impact_studies/a01_imp.pdf",
      "system_impact_study_status": "Document Posted",
      "test_energy_date": null,
      "transmission_owner": "ME",
      "upgrade_construction_service_agreement": "N/A",
      "upgrade_construction_service_agreement_status": "N/A",
      "wholesale_market_participation_agreement": "N/A",
      "withdrawal_date": null,
      "withdrawn_remarks": null
    }
  ],
  "rows": [
    {
      "group": {},
      "lineage": {
        "citation_ref": "c1"
      },
      "metrics": {
        "in_service_mw": 673.0,
        "requested_max_output_mw": 720.0,
        "requested_summer_mw": 673.0,
        "requested_winter_mw": 720.0,
        "source_record_count": 1
      }
    }
  ],
  "source_id": "energy.pjm.queue",
  "summary": {
    "group_count": 1,
    "totals": {
      "in_service_mw": 673.0,
      "requested_max_output_mw": 720.0,
      "requested_summer_mw": 673.0,
      "requested_winter_mw": 720.0,
      "source_record_count": 1
    }
  }
}