  "as_of": "2026-06-11",
  "citations": {
    "c1": {
      "source_rows_count": 101,
      "verify": {
        "as_of": "2026-06-11",
        "raw_file_sha256": "9c93ab87eeac2602ac672dfc2baa024d2d020076165717012e1cadf207764510",
        "sheet": "Interconnection Queue",
        "source_file": "nyiso-queue_2026-06-11_sample.xlsx",
        "source_id": "energy.nyiso.queue",
        "source_row": 1,
        "source_url": "https://www.nyiso.com/interconnections"
      }
    }
  },
  "primitive": "query_power_interconnection_queue_nyiso_v1",
  "query": {
    "as_of": "2026-06-11",
    "group_by": [],
    "include_records": true,
    "limit": 1,
    "sheet_name": [
      "Interconnection Queue"
    ]
  },
  "records": [
    {
      "affected_to": null,
      "application_status": "ACTIVE",
      "as_of": "2026-06-11",
      "citation": {
        "as_of": "2026-06-11",
        "raw_file_sha256": "9c93ab87eeac2602ac672dfc2baa024d2d020076165717012e1cadf207764510",
        "sheet": "Interconnection Queue",
        "source_file": "nyiso-queue_2026-06-11_sample.xlsx",
        "source_id": "energy.nyiso.queue",
        "source_row": 1,
        "source_url": "https://www.nyiso.com/interconnections"
      },
      "county": "Cortland",
      "county_fips": "36023",
      "county_fips_source": "name",
      "county_fips_unresolved": false,
      "cy_fs_complete_date": "2021-02-08",
      "developer": "Homer Solar Energy Center LLC",
      "end_use": null,
      "energy_storage_capability": null,
      "fs_completion_date": null,
      "ia_tender_date": "2021-02-08",
      "ir_date": "2008-01-30",
      "iso": "NYISO",
      "last_update": "2026-05-31",
      "min_duration_full_discharge": null,
      "peak_mw_load": null,
      "point_of_interconnection": "Cortland - Fenner 115kV",
      "project_name": "Homer Solar Energy Center",
      "project_type": null,
      "proposed_cod": "06-2028",
      "proposed_in_service": "04-2028",
      "proposed_initial_backfeed": null,
      "proposed_sync_date": "04-2028",
      "queue_position": "0276",
      "raw_file_sha256": "9c93ab87eeac2602ac672dfc2baa024d2d020076165717012e1cadf207764510",
      "record_type": "Large Facility",
      "report_period": "2026-06-11",
      "sheet_name": "Interconnection Queue",
      "sis_bundle": null,
      "source_id": "energy.nyiso.queue",
      "source_record_key": "Interconnection Queue:0276",
      "source_row_number": 1,
      "sp_mw": 90.0,
      "state": "NY",
      "state_raw": "NY",
      "studies_available": "FES, SRIS, FS",
      "study_status_code": "11",
      "type_fuel": "S",
      "utility": "NM-NG",
      "wp_mw": 90.0,
      "zone": "C"
    }
  ],
  "rows": [
    {
      "group": {},
      "lineage": {
        "citation_ref": "c1"
      },
      "metrics": {
        "peak_mw_load": null,
        "source_record_count": 101,
        "sp_mw": 10898.5,
        "wp_mw": 10899.5
      }
    }
  ],
  "source_id": "energy.nyiso.queue",
  "summary": {
    "group_count": 1,
    "totals": {
      "peak_mw_load": null,
      "source_record_count": 101,
      "sp_mw": 10898.5,
      "wp_mw": 10899.5
    }
  }
}