  "as_of": "2026-04-01",
  "citations": {
    "c1": {
      "source_rows_count": 3,
      "verify": {
        "as_of": "2026-04-01",
        "raw_file_sha256": "f683dd5978363f74c90216de1f5e47053c9a02c62f80f45dfb9f8d760047dde7",
        "sheet": "Planned",
        "source_file": "eia860m_sample.xlsx",
        "source_id": "energy.eia.eia860m",
        "source_row": 6,
        "source_url": "https://www.eia.gov/electricity/data/eia860m/"
      }
    }
  },
  "notes": [
    {
      "code": "cumulative_lifecycle",
      "field": "planned_operation_date",
      "message": "Planned capacity is the full forward pipeline across all planned operation years, not a single-period flow. Filter by planned_operation_date_from/_to for a given year."
    }
  ],
  "primitive": "query_power_capacity_v1",
  "query": {
    "as_of": "2026-04-01",
    "group_by": [
      "balancing_authority_code"
    ],
    "include_records": false,
    "included_in_default_us_metrics": true,
    "lifecycle": [
      "planned"
    ],
    "state": [
      "TX"
    ]
  },
  "rows": [
    {
      "group": {
        "balancing_authority_code": "ERCO"
      },
      "lineage": {
        "citation_ref": "c1"
      },
      "metrics": {
        "distinct_plant_count": 3,
        "generator_count": 3,
        "nameplate_mw": 645.6,
        "net_summer_mw": 627.1,
        "net_winter_mw": 627.1,
        "source_record_count": 3
      }
    }
  ],
  "source_id": "energy.eia.eia860m",
  "summary": {
    "group_count": 1,
    "totals": {
      "distinct_plant_count": 3,
      "generator_count": 3,
      "nameplate_mw": 645.6,
      "net_summer_mw": 627.1,
      "net_winter_mw": 627.1,
      "source_record_count": 3
    }
  }
}